Every study, agreement and model behind the numbers, with the vendor that produced it, a one-paragraph brief and a download. Items marked 'on request' are being executed or compiled.

Third-party studies

Underwriting by LDP, ProFun, Savills, IHG, Dar Al Qias and ZFP

Each brief states what the study provides and how the financing model uses it; where a study's own figures have been superseded, the brief says so.

LDPLDP · Leisure Development Partners

Experience Centre market, benchmark & attendance study — Report 6.0

Madinah and religious-tourism demand, international benchmarks of immersive attractions, entertainment-value pricing (SAR 78 per visit) and attendance of 1.19M visitors by 2031 — the attendance basis ProFun adopted. LDP's more conservative 31%-margin revenue case is carried in the model as the Centre downside sensitivity.

PDF
Open the study
Opens in a new tab · PDF
SavillsSavills

Retail tenant mix, rents and pro-forma — 24 July 2024

Positioning of the boulevard, unit-by-unit tenant mix, indicative rents by category (SAR 500–1,900/sqm), occupancy ramp 50/70/92%, service-charge, specialty-leasing and sponsorship income, and SAR 39.7M of landlord fit-out contributions. Savills priced 53,987 sqm (48,467 + optional mezzanine) at SAR 52 / 67 / 82M in years 1–3. The model keeps Savills' mix and scales every income line to the 38,597 sqm Phase 1 GLA (× 0.715); expansion to Savills' recommended area is a later retail phase.

PDF
Open the study
Opens in a new tab · PDF
IHGIHG Hotels & Resorts

Staybridge Suites feasibility (FAP) and financial projections — 2025

Brand feasibility for a 300-key Staybridge Suites and the per-key economics used to underwrite the 600-key scheme: occupancy 57→63%, ADR SAR 590→660, RevPAR SAR 336→398, GOP 44→47%, fee structure and FF&E reserve. IHG has since withdrawn; the projections remain the underwriting benchmark and the 300-key case is a sensitivity.

PDF
Open the study
Opens in a new tab · PDF
IHGIHG Hotels & Resorts

Hotel financial projections (Excel) — August 2025

Ten-year P&L for a 300-key Staybridge Suites: occupancy, ADR, departmental and undistributed costs, management fees and NOI (38–39%). The model's hotel ramp (90.5% / 95.2%), rooms share (83.4%), ADR growth (2.2%) and GOP margins (44.2 / 46.1 / 47.4%) are taken from this file and applied per key to 600 keys.

XLSX
Open the study
Opens in a new tab · XLSX
ProFunProFun Management Group

Experience Centre business plan for Midwam — Rev. 1, January 2025

Operator's pro-forma business plan and the Centre's base case: attendance of 1.14M visitors in 2028 rising to 1.55M by 2040 (LDP's forecast), revenue per visitor SAR 92→121, a 13-year consolidated P&L (p.59) with EBITDA after management fees of 35.5%→43.2%, staffing, marketing and a SAR 36.4M pre-opening budget. The model uses this pro-forma line by line.

PDF
Open the study
Opens in a new tab · PDF
Dar Al QiasDar Al Qias

Land valuation analysis — final report, 21 March 2024

Market rental value of the Al-Maqr leasehold — SAR 16.5M/yr on 205,365 sqm against the SAR 2.39M contract rent — and the NPV of the rent saving (SAR 71.2M). The site has since grown to 245,337 sqm; the model pro-rates the saving to ≈ SAR 85M as the interim value of Koushan's in-kind contribution pending a certified valuation. The report's own development appraisal predates the current programme and is not used.

PDF
Open the study
Opens in a new tab · PDF
ZFPZuhair Fayez Partnership

Masterplan concept design — February 2025

Masterplan, architectural concept, water axis, facades and the February 2025 hard-cost estimate for the boulevard and Experience Centre that Watanco's SAR 550M guaranteed maximum price superseded.

PDF
Open the study
Opens in a new tab · PDF
Watanco & ZFPWatanco & ZFP

Hotel concept design — December 2025

Pre-concept design for the 600-key hotel (300 hotel keys + 300 serviced apartments): site analysis, massing inspired by Ayer Mountain, 29,152 sqm BUA, room matrix, floor plans and perspectives. Hotel FF&E of SAR 50M and pre-opening of SAR 15M are carried in the model.

PDF
Open the study
Opens in a new tab · PDF
Legal & land

Agreements

PDF
Master Strategic Partnership, Development, EPCF & Governance Agreement — Koushan & Watanco, signed 13 July 2026
Opens in a new tab · PDF
Establishes the SPV, the EPCF model, the SAR 550M capital cost cap (Art. 15), governance and Koushan's reserved matters (Art. 12), the 60-day proof-of-funding obligation (Art. 17) and SCCA arbitration. Art. 9.1 (36/64) and Art. 17 are being amended for the 64/36 shareholder-loan structure.
—
Al-Maqr land lease contract 23/007 and addendum (15 Apr 2024)
Available on request · pending execution
50-year usufruct over 245,337 sqm at King Fahd Park; fixed rent SAR 2.39M + 2% of revenue; rent-free to 15 April 2028.
—
Amendment / shareholders' agreement (64 / 36)
Available on request · pending execution
Documents Watanco's 64%, the interest-free shareholder loan senior to all distributions, and Koushan's 36%.
Investor materials
PDF
Financing proposal deck v1.0 (PDF, 27 slides)
Opens in a new tab · PDF
The credit-committee deck: transaction summary, components with financial timelines, structure, SPV exhibit, returns, debt capacity, sensitivities, risks and path to close. Same numbers as this site.

Earlier marketing documents and the contractor's own feasibility, business-plan, valuation and financing papers are held in the data room only; this business case supersedes them.