Al-Madinah Al-Munawwarah · King Fahd Park. A SAR 550 million Seerah-themed destination — Experience Centre and F&B boulevard, with a 600-key hotel as Phase 2 — fifteen minutes from the Prophet's Mosque.
64% · Funding partner & EPCF contractor
36% · Developer & asset managerWatanco Contracting Co. (64%) provides the Mayadeen Park SPV with an interest-free shareholder loan that funds 100% of the SAR 550M development cost, pre-opening included, and raises its own financing against it. Every riyal of SPV cash repays that loan before any dividend is paid, and the whole project is available as collateral to Watanco's financing banks.

18,050 sqm of VR, 5D and immersive theatres retelling the Hijra and the great events of early Islam — the anchor at the end of the water axis, on ProFun's operator pro-forma.
● 1.20M visitors by 2031 · SAR 119M revenue
26.2% component IRR, 2040 exit

38,597 sqm GLA of open-air dining, cafés and specialty retail along a ceremonial water axis, on a Savills tenant mix.
● 92% occupancy at stabilisation · SAR 59M revenue
19.9% component IRR, 2040 exit

Phase 2: 300 hotel keys and 300 serviced apartments, built from 2027 once the construction permit and Al-Maqr approval are obtained; concept by Watanco & ZFP, underwritten on IHG per-key projections.
● ADR SAR 850 peak / 450 off-peak · SAR 107M revenue
19.0% component IRR, 2040 exit
Visitors stay several nights in Madinah, yet modern cultural and family experiences are scarce. The Guests of Allah programme is building structured itineraries — Mayadeen is designed as a stop on them, with shuttle links to the Prophet's Mosque.
Sources: Al-Maqr hospitality report via TradeArabia (2025); Ministry of Tourism; GASTAT; Global Muslim Travel Index; LDP Report 6.0.

Contract 23/007 with Al-Maqr (Aug 2023); 50-year usufruct over 245,337 sqm, handed over April 2024. Phase 2 (hotel) proceeds once the construction permit and Al-Maqr's approval are obtained.
Masterplan and detailed design by Zuhair Fayez Partnership; hotel concept by Watanco & ZFP; feasibility by KPMG, LDP and Savills; ProFun operator plan; IHG projections.
Master EPCF Agreement signed 13 July 2026: SAR 550M guaranteed maximum price, 24-month programme; enabling works under way since Aug 2025.

64% · Funding partner, EPCF contractor & construction manager
Provides an interest-free shareholder loan for the full funding need, repaid from 100% of SPV cash before any dividend, and raises its financing with the project as collateral. Madinah-based general contractor (est. 1435H) delivering design completion, procurement and construction under a SAR 550M guaranteed maximum price; funds any overrun. Track record includes Al Seeh Plaza Hotel and municipal works in Madinah.

36% · Developer & asset manager
Originated the project and holds the land rights, masterplan, designs and permits; established the SPV and holds reserved matters. The asset-management role is covered within the SPV's AM & G&A overhead — no separate fee.
The 64/36 shareholding and shareholder-loan treatment are agreed; the amendment to the Master EPCF Agreement and the shareholders' agreement are being documented.
Placeholder terms (6.5%, 4-year grace with capitalised profit, 100% cash sweep) for sizing only; tenor, pricing, grace, currency and security to be agreed. Every sensitivity tested — including a hotel at IHG's 300-key level, the Centre at LDP's lower case and Phase 1 on its own — repays the shareholder loan. Full sensitivities →
SAR 550M guaranteed maximum price from Watanco, itself the 64% shareholder and funder; any overrun is funded by Watanco.
The shareholder loan is repaid from 100% of SPV cash before any dividend — no lender and no distribution ahead of it.
Pledge over SPV shares, assignment of the shareholder loan and project cash flows, and security over the Al-Maqr usufruct (subject to lessor consent).
SAR 2.39M fixed rent plus 2% of revenue — under 3% of revenue, ~85% below the Dar Al Qias market rent.
Hotel 38%, centre 42%, retail 21% of revenue; the loan is repaid even with all revenue 20% below plan or the Centre at LDP's lower case.
Developer and contractor are paid through the same waterfall; Koushan's 5% fee is on retail revenue only and distributions follow repayment.
Nov 2026
Term sheets from Watanco's financing banks: amount, tenor, pricing, grace, currency, security and covenants.
Nov–Dec 2026
Audited financials of Watanco and Watanco; independent technical adviser on GMP and programme; legal opinion on Saudi security and the Al-Maqr usufruct.
Dec 2026
Amendment / SHA for 64/36; certified in-kind valuation; written Al-Maqr confirmation of the rent-free period; hotel construction permit and Al-Maqr approval (Phase 2); operator shortlist.
Q1 2027
Facility agreement; first drawdown against Watanco's approved cash-flow forecast.